Minor Electrical Installation Works Certificate

Minor works certificate app

The minor works certificate is the BS 7671 model form for minor electrical work that does not include a new circuit, such as an extra socket-outlet or moving a light switch. It is not for a consumer unit change. ClearWorks lets you issue it on site, linked to the EICR findings it fixes, and send it before you leave.

Last updated

  • From £15 a month + VAT, unlimited certificates
  • 3 free certificates, no card needed

When the minor works certificate is the right form

The Minor Electrical Installation Works Certificate is a BS 7671 model form. Its heading says it is to be used only for minor electrical work which does not include the provision of a new circuit.

Use it for

  • additions and alterations to an existing circuit, such as an extra socket-outlet or lighting point
  • moving a light switch
  • replacing equipment such as accessories or luminaires

Don’t use it for

  • a new circuit
  • replacing a consumer unit, distribution board or similar

Those need an Electrical Installation Certificate.

The form’s notes add that appropriate inspection and testing should always be carried out, however small the job.

What you record

The BS 7671:2018+A4:2026 model form has five sections, A to E.

  1. Description of the minor works. Client, address, date completed, what was done, any departures from BS 7671, and comments on the existing installation.
  2. Earthing and bonding. The system earthing arrangement, the earth fault loop impedance at the distribution board (Zdb), and the main protective conductors.
  3. Circuit details. The circuit, conductor sizes, and the overcurrent device, RCD, AFDD and SPD.
  4. Test results. Continuity, insulation resistance, polarity, maximum measured Zs, RCD disconnection time, and the AFDD and SPD checks, where relevant and practicable.
  5. Declaration. You certify that the work does not impair the safety of the existing installation and was designed, constructed, inspected and tested to BS 7671.

Minor works after a landlord EICR, in England

Under the Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020, when a report requires remedial work the landlord has 28 days from the inspection to get it done by a qualified person, or less if the report says so.

The landlord then needs written confirmation from a qualified person that the work has been carried out, and that the electrical safety standards are met or that more work is needed. That confirmation goes, with the original report, to each tenant and the local housing authority within 28 days of the work being completed.

Government guidance lists a Minor Electrical Installation Works Certificate as one acceptable form of that confirmation. So the landlord is waiting on your certificate. These rules apply in England only.

How ClearWorks handles minor works

  • Linked to the EICR findings it fixes
  • Turn the EICR findings into a quote in one tap, then do the work
  • Missing details and readings outside limits are flagged
  • Zs checked against the protective device
  • No signing with something missing, no sending without your registration number and signatures
  • Works with no signal, on phone, tablet and desktop

When you sign, the certificate goes to the landlord, agent and tenant with your logo, and you get a record of when each one opened it. It stays in the property’s certificate history beside the EICR.

Invoice from the same place and take card payment to your own account.

ClearWorks checks each certificate against the form’s rules. Choosing the right form, and the work, the testing and the certificate, remain your responsibility. ClearWorks is not affiliated with or endorsed by NICEIC, NAPIT or ELECSA.

Minor works questions

Can I use a minor works certificate for a consumer unit change?

No. The notes on the BS 7671 model form say it is not for replacing consumer units, distribution boards or similar items. That work needs an Electrical Installation Certificate.

Can I use it for a new circuit?

No. The form is only for minor work that does not include the provision of a new circuit. A new circuit needs an Electrical Installation Certificate.

Is one certificate enough for work on two circuits?

The guidance on the model form says a separate certificate should be issued for each existing circuit on which minor works have been carried out.

Will a landlord in England accept it as confirmation of remedial work?

Government guidance for England lists a Minor Electrical Installation Works Certificate as acceptable written confirmation that remedial work has been carried out.

Sources: IET, BS 7671:2018+A4:2026 model forms (Minor Electrical Installation Works Certificate, dated 15 April 2026). Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020, regulation 3. GOV.UK, Electrical safety standards in the private and social rented sectors: guidance. Last checked 18 November 2026.

Related

Close out the EICR with a minor works certificate.

Your first 3 certificates are free. No card needed.

Founding London engineers keep their price for as long as they stay subscribed.

Get 3 free certificates