For electricians. Last checked 18 November 2026.
EICR template: the free model form, and what goes in it
The standard EICR template is the IET’s model Electrical Installation Condition Report, published free on its model forms page for BS 7671:2018+A4:2026. Contractors may copy and electronically adapt it for their own business, under the IET’s conditions. Use the Amendment 4 form: the IET says Amendment 2 has been obsolete since its transition period ended on 15 October 2026.
Last updated
Where to get the official template
The IET publishes the BS 7671 model forms free on its model forms page. For BS 7671:2018+A4:2026 it lists:
- Electrical Installation Condition Report (EICR), with the schedule of circuit details, schedule of test results and schedule of inspection
- Minor Electrical Installation Works Certificate
- Electrical Installation Certificate
- Schedule of supplementary protective equipotential bonding inspection and test results
- An all-forms PDF
The IET lets contractors copy and electronically adapt the forms free of charge, for use only in their own electrical contracting business. Blank forms may not be copied for resale, and the IET logo may not be reproduced. Read the full conditions on the IET page before you use them.
The Amendment 2 and original 2018 forms are still on the same page. The IET says Amendment 2 has been obsolete since its transition period ended on 15 October 2026, so use the Amendment 4 forms. What changed on the A4 form.
ClearWorks is not affiliated with or endorsed by the IET or BSI. Download the forms from the IET page linked above.
What the EICR asks for: the main sections
- A to C. The opening sections. Who ordered the report, why it was produced, and the details of the installation.
- D. Extent and limitations. What you did and did not inspect. A4 adds a standard limitation: no checks for safety alerts, corrective actions or product recalls unless agreed beforehand.
- E. Summary of condition. Satisfactory or unsatisfactory. The A4 form states that only a C1 or C2 makes it unsatisfactory. C3 and FI are advisory.
- F. Recommendation for next inspection. A date, and the reasons for it.
- G. Declaration. Signatures of the person inspecting and the person authorising the report.
- I and J. Supply and installation. Supply characteristics, earthing arrangements and particulars of the installation.
- K. Observations. On A4, split into two tables: C1 and C2, then C3 and FI. Photos and thermal images can be attached.
- Schedules. Circuit details, test results and inspection.
A summary to help you find your way around the form. Work from the IET model form and BS 7671:2018+A4:2026 itself.
Minor works template
The Minor Electrical Installation Works Certificate is on the same IET page. It is for work that does not add a new circuit, such as adding a socket to an existing circuit or replacing an accessory. It is not for a replacement consumer unit or distribution board. Minor works certificate in ClearWorks.
A blank template or an app?
A PDF template is fine if you issue a few reports a year, but it checks nothing. You can sign with a schedule half filled in or a code that does not match the summary. In ClearWorks:
- Observations coded C1, C2, C3 or FI, on the BS 7671:2018+A4:2026 form
- Zs is checked against the protective device as you enter it
- The report is sent before you leave, and renewals are tracked
- Minor works links to the EICR findings it fixes
The checks catch what is easy to miss. You remain responsible for the inspection and the report.
Questions about EICR templates
Is there a free EICR template?
Yes. The IET publishes the model EICR for BS 7671:2018+A4:2026 free on its model forms page, with conditions on how you use it.
Can I change the IET form?
The IET lets contractors electronically adapt the forms for use in their own electrical contracting business. Keep every field the model form asks for. Read the IET’s conditions first.
Should I still use the Amendment 2 form?
No. Amendment 4 is the current edition. The IET says Amendment 2 has been obsolete since its transition period ended on 15 October 2026.
Does ClearWorks give me a downloadable template?
ClearWorks is an app, not a PDF. You fill in the EICR on your phone and it checks the report before you sign. From £15 a month + VAT, with 3 free certificates.
Related pages
Sources: IET model forms and conditions of use; IET model EICR for BS 7671:2018+A4:2026; IET model minor works certificate; IET, BS 7671 and the end of the Amendment 2 transition. Last checked 18 November 2026.
Fill in your next EICR on your phone
Your first 3 certificates are free. No card needed.
Founding London engineers keep their price for as long as they stay subscribed.