Guide for electricians
BS 7671 Amendment 4 (2026): what changed on the EICR
BS 7671:2018+A4:2026 was published on 15 April 2026, and the previous version was withdrawn on 15 October 2026. On the IET’s Amendment 4 model EICR, only a C1 or C2 makes the report unsatisfactory; C3 and FI are advisory, and FI now reads “Further investigation is advised”. For landlords in England, an FI can still start a 28-day clock.
Last updated
Last checked 18 November 2026.
Read this first
This is a summary to help you find what changed. It is not the standard. Work from the published BS 7671:2018+A4:2026, the IET model forms and your scheme's guidance. ClearWorks is not affiliated with or endorsed by the IET or BSI.
The form changes described here are the differences between the IET's Amendment 4 model EICR (dated 15 April 2026) and its Amendment 2 model EICR (dated 28 March 2022). The list of changes to the standard itself is the one the IET and BSI have published.
Quick summary
- Amendment 4 was published on 15 April 2026. The IET says it is now the current edition.
- The previous version was withdrawn six months later, on 15 October 2026.
- On the Amendment 4 model form, only a C1 or C2 makes the overall assessment unsatisfactory. C3 and FI are described as advisory.
- FI now reads "Further investigation is advised". The Amendment 2 form said "Further investigation required without delay".
- Section K (observations) is split in two: C1 and C2 in one table, C3 and FI in another.
- The form now says photographs and thermal images can be attached to support observations.
- The landlord rules in England have their own wording on further investigation. An FI can still start a 28-day clock for the landlord.
The dates
The IET and BSI published Amendment 4 on 15 April 2026. The same press release says the previous version, BS 7671:2018+A2:2022+A3:2024, "will be withdrawn six months from today". The IET's January announcement said Amendment 4 "can be implemented immediately" on publication.
BSI gives the withdrawal date as 15 October 2026 and says that after this window only the new standard is recognised as the UK national standard. The IET's up to date with BS 7671 page says the Amendment 2 transition period ended on 15 October 2026, that Amendment 2 "is now obsolete", and that Amendment 4 "is now the current edition".
So for an inspection you carry out today, Amendment 4 is the edition to work to.
What the IET lists as the main changes
The IET's announcement lists these headline changes. Most will not come up on a typical rented flat or house, but you should know they exist.
- A new chapter on stationary secondary batteries, for electrical storage.
- A new section on functional earthing and functional equipotential bonding for ICT equipment and systems.
- A new section on Power over Ethernet (the April release names it as Section 716).
- A major revision of Section 710, medical locations, including a schedule of test results for recording the resistance of supplementary protective equipotential bonding conductors.
- Amendment 3:2024 folded into the main document.
- "Further changes" throughout all parts of the standard.
What changed on the model EICR form
This section compares the IET's Amendment 4 model EICR with the Amendment 2 form. Both are free to download from the IET model forms page.
FI no longer makes the report unsatisfactory
This is the change most likely to affect how you fill in a landlord EICR.
Section E of the Amendment 4 form says an unsatisfactory assessment "indicates that dangerous (code C1) and/or potentially dangerous (code C2) conditions have been identified". It then says any observation coded C3 or FI "is advisory and does not affect the overall assessment but should be given due consideration".
The notes on the Amendment 2 form said the opposite for FI. Where further investigation might reveal a C1 or C2, the observation was to be coded FI "and marked as unsatisfactory in Section E".
The wording of the code has changed to match:
- Amendment 2 form: "FI – Further investigation required without delay".
- Amendment 4 form: "FI – Further investigation is advised".
The guidance for recipients now explains FI as a potential issue where the inspector cannot decide a classification code until further investigation has taken place.
FI is not a way to avoid a decision. If you can see enough to code it C1 or C2, code it. Check your scheme's guidance on how it expects FI to be used under Amendment 4.
Section K is split in two
The Amendment 2 form had one observations table. The Amendment 4 form has two:
- C1 and C2 observations. The form says "These items affect the overall assessment of the report."
- C3 and FI observations. The form says "These items do not affect the overall assessment of the report."
Section K also carries a new note: photographic and/or thermographic images can be attached to the report to support the observations.
Sections D, E and F
- Section D (extent and limitations). The printed limitations are now set out as bullets. One is new: unless agreed otherwise, no checks have been made for safety alerts, corrective actions or product recalls on equipment forming part of the installation.
- Section E (summary). The advice to act on C1 and C2 items as a matter of urgency now sits here, with the C3 and FI wording quoted above.
- Section F. Now titled "Recommendation for next inspection". It asks for a date and the reasons for it. The notes refer to Regulation 653.4 for that explanation.
Notes for the person producing the report
The notes on the Amendment 4 form state that:
- The signatures are those of the person or persons carrying out the inspection and testing and authorising the report for issue.
- The report records observations against the requirements of BS 7671 current at the time of the inspection.
- An installation designed to an earlier edition that does not fully comply with the current one "is not necessarily unsafe for continued use", and does not necessarily need upgrading.
- The report should include the guidance for recipients, the schedule of inspection, and the schedules of circuit details and test results.
A separate bonding schedule
The IET model forms page now lists a "Schedule of Supplementary Protective Equipotential Bonding Inspection and Test Results" among the Amendment 4 forms. The IET's announcement ties this schedule to the revised Section 710 on medical locations.
Landlord EICRs in England: the law is separate
BS 7671 is a British Standard. The landlord duty comes from the Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020. These apply in England only, to private and social landlords.
- The landlord must have every electrical installation inspected and tested by a qualified person at intervals of no more than 5 years, or sooner if the last report says so.
- A qualified person is defined as a person competent to carry out the inspection and testing, and any further investigative or remedial work.
- The regulations define the "electrical safety standards" as the standards in the eighteenth edition of the Wiring Regulations, published as BS 7671:2018. The definition does not name an amendment.
- Where the report requires further investigative or remedial work, the landlord must have it done by a qualified person within 28 days of the inspection, or sooner if the report says so.
Why FI still matters for a landlord
Under the Amendment 4 form, an FI on its own no longer makes the report unsatisfactory. But the 2020 Regulations deal with "further investigative" work in their own terms, with their own 28-day limit. GOV.UK's landlord guidance says that where an inspector identifies that further investigative work is required (FI), the landlord must ensure it is carried out. That guidance still shows the Amendment 2 wording for FI. So a satisfactory report with an FI on it can still leave the landlord with work to arrange. Say so plainly when you hand the report over.
How ClearWorks fits in
The ClearWorks EICR form is built to BS 7671:2018+A4:2026, with observations coded C1 to FI. A C1 or C2 makes the report Unsatisfactory. Zs is checked against the protective device as you enter it. A minor works certificate can be linked to the EICR findings it fixes.
The software flags and checks against the form's rules. You remain responsible for the inspection and the report.
See the EICR softwareSources
- IET press release, 15 April 2026: IET and BSI officially publish Amendment 4
- IET press release, 15 January 2026: Amendment 4 announced
- IET: Ensure you are up to date with BS 7671
- BSI: BS 7671:2018+A4:2026, the latest amendment
- IET model forms page
- IET model EICR for BS 7671:2018+A4:2026 (PDF)
- IET model EICR for BS 7671:2018+A2:2022 (PDF)
- Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020, regulation 2
- Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020, regulation 3
- GOV.UK: Electrical safety standards in the private and social rented sectors: guidance
Last checked 18 November 2026. Quotations are from the documents linked above. ClearWorks is not affiliated with or endorsed by the IET, BSI, NICEIC, NAPIT or ELECSA. This guide is not legal advice.
Try the EICR form on your next job
3 free certificates per engineer. No card needed.
Founding London engineers keep their price for as long as they stay subscribed.