Consumer unit replacement: cost, rules and paperwork
Published 2026 guides put a consumer unit change at roughly £450 to £750 for an ordinary home, and more in London. In England it is notifiable building work, and a new unit in a home needs a non-combustible case or cabinet. This guide gives the figures by source, then the rules and the certificates you should be given.
Last updated
What a consumer unit is
The consumer unit is the box that takes the supply from your meter and splits it into the circuits of the home. The IET’s guidance for householders notes it has had several names over the years, including fuse box and fuse board. Three kinds of device sit inside it:
- Main switch. It turns the whole installation off. The IET points out that it isolates only and gives no protection of its own.
- Circuit-breakers or fuses. One per circuit, such as the cooker, shower, sockets and lights. They act on overcurrent and short circuits.
- Residual current devices (RCDs). These protect people from electric shock. The IET says that, generally, every circuit in a home now needs this additional protection, and that the test button should be pressed every six months.
Our electrical symbols guide shows how a consumer unit is drawn on an installation plan.
Consumer unit replacement cost: published prices
These prices are published by the named providers, not by ClearWorks. Each row keeps its own VAT wording and date.
| Source | Price | What it covers | VAT | Page date |
|---|---|---|---|---|
| MyJobQuote cost guide | £525 average. Range £350 to £850 | Materials and labour. It lists removal of the old unit, the new unit fitted, testing of all circuits and an Electrical Installation Certificate | Not stated | Updated 2 November 2026 |
| MyJobQuote, by size | 6-way £350 to £500. 10-way £480 to £640. 12-way £610 to £850 | High-integrity units rated 100A | Not stated | As above |
| Fantastic Services cost guide | £450 to £750 | Outside London and the South East. A standard 10-circuit unit is put at £470 to £650 | “Figures include VAT where applicable” | Titled 2026 UK price guide |
| IET consumer guidance | £500 to £2,000 | “Typical costs” for a domestic consumer unit including installation | Not stated | No date shown |
The two cost guides overlap between roughly £450 and £750. The IET’s range is wider because it allows for different sizes of installation and kinds of protection.
New consumer unit cost in London
Two of the sources publish a London figure. MyJobQuote gives £550 to £800 or more, which it puts at 23% above its UK midpoint. Fantastic Services gives £700 to £1,200 for London and the South East, and says the region runs roughly 15–30% above the North of England, Wales and Scotland.
What is usually extra
- Remedial work. Fantastic Services lists faults in earthing, bonding or circuits found during testing as charged separately. MyJobQuote puts earth bonding at about £150 to £300.
- Meter tails. MyJobQuote says replacing them may sit outside the quote, at £100 to £200.
- Moving the board. MyJobQuote says larger moves can reach £1,000 to £1,200 or more.
Prices change, so confirm with the provider before you agree a price. ClearWorks is not affiliated with any provider or website named on this page.
Why a new unit is a metal consumer unit
A unit fitted in a home today will almost always have a steel case. The reason is regulation 421.1.201 of BS 7671, added by Amendment 3 to BS 7671:2008 in 2015, with an implementation date of 1 January 2016.
In the IET’s summary, a consumer unit in domestic premises must either have an enclosure made of non-combustible material, or be housed in a cabinet made of it. Steel is given as an example of such a material. The IET says the rule followed reports of a rising number of fires involving units with moulded plastic cases. The aim is to contain a fire inside the enclosure.
The rule applies when a unit is installed or replaced. It does not condemn existing boards. The IET’s overview says it is not a requirement that every plastic unit be replaced. It has also said that adding a circuit on a spare way of an existing plastic unit does not mean the unit must be changed.
When a consumer unit needs replacing
None of the bodies cited on this page sets an age at which a board must go. The IET’s position is that a competent person should inspect the installation and decide whether the unit is still safe and suitable, taking into account age, condition and where it is fitted.
The IET lists things a householder can look for:
- a burning smell, excessive heat, smoke, or signs of burning or charring. Its advice is to isolate the installation at once and call a registered electrical contractor
- a gap or hole in the case big enough for a finger
- an RCD that does not switch off when its test button is pressed
A tripping breaker or RCD is not proof of a bad board. The IET says an appliance is the more likely cause.
An inspection is written up as an Electrical Installation Condition Report (EICR), which records the condition of the existing installation. Electrical Safety First uses a board with no RCD protection as its example of code C3, “improvement recommended”: an upgrade is advised, but it is not urgent and C3 is a recommendation only. For inspection prices, see EICR cost.
The rules in England: notifiable work
Replacing a consumer unit is one of three kinds of electrical work in a dwelling that regulation 12(6A) of the Building Regulations 2010 makes notifiable. The other two are a new circuit, and changes to circuits in a special location. That paragraph applies in England.
Approved Document P sets out three ways to certify notifiable work:
- self-certification by an installer registered with a competent person scheme
- certification by a registered third-party certifier, appointed before the work starts
- certification by a building control body, notified before the work starts
GOV.UK points householders to the Electrical Competent Person Register. It warns that you may have to correct the work or pay a fine if building regulations are not followed.
The paperwork you should receive
Electrical Safety First says that after a new board you should get two documents:
- An Electrical Installation Certificate. The notes on the IET’s model form name the replacement of a consumer unit as one of its uses. The notes on the minor works form say that form is not for replacing consumer units. See our Electrical Installation Certificate guide.
- A Building Regulations compliance certificate. Approved Document P says the installer or their registration body must give the occupier a copy within 30 days of completion. GOV.UK’s general page on competent person schemes says within 8 weeks.
If a registered installer will not hand them over, Electrical Safety First’s advice is to contact their certification body. To tell these documents apart from other reports, see which electrical safety certificate you need.
For electricians: the report before and the small jobs after
The EICR records the condition of the existing installation before anyone decides what to do. Later, small jobs on existing circuits, such as an added socket-outlet, are minor works.
ClearWorks handles both. Do the EICR on your phone, coded to BS 7671:2018+A4:2026, turn the findings into a quote, and issue a minor works certificate linked to the findings it fixes. For what changed in the report, read BS 7671 Amendment 4 and the EICR.
The electrical plan is £15 per engineer a month + VAT. Pay as you go is £2.50 a certificate + VAT. Your first 3 certificates are free.
EICR software for electricians
This page is a summary for general information, last checked 18 November 2026. It is not the standard or legal advice. Electricians must follow the current edition of BS 7671, the Building Regulations and manufacturer instructions, and remain responsible for the work, the testing and the certificates. The IET papers on regulation 421.1.201 cited here date from 2015, so check the current wording. ClearWorks is independent and is not affiliated with or endorsed by the IET, BSI, NICEIC, NAPIT, Electrical Safety First or any provider named here.
Sources: MyJobQuote consumer unit replacement cost guide; Fantastic Services fuse box replacement cost guide; IET: consumer units guidance for consumers, new non-combustible enclosure requirement for consumer units, consumer units: a brief overview and BS 7671 model forms; Building Regulations 2010, regulation 12; GOV.UK: Approved Document P, use a competent person scheme and current competent person schemes; Electrical Safety First, your questions answered. Last checked 18 November 2026.
Consumer unit replacement questions
How much does it cost to replace a consumer unit?
Published 2026 guides overlap between about £450 and £750 for an ordinary home. MyJobQuote gives an average of £525 and a range of £350 to £850. Fantastic Services gives £450 to £750 outside London and the South East. The IET quotes a wider £500 to £2,000 including installation.
Does a consumer unit change cost more in London?
The two guides that give a London figure both say yes. MyJobQuote gives £550 to £800 or more for London. Fantastic Services gives £700 to £1,200 for London and the South East.
Do I have to replace a plastic consumer unit with a metal one?
Not just because it is plastic. The IET says it is not a requirement that existing plastic units be replaced. A competent person should inspect the installation and judge whether the unit is still safe and suitable. A unit fitted now must meet the non-combustible enclosure rule.
Is replacing a consumer unit notifiable?
In England, yes. Regulation 12(6A) of the Building Regulations 2010 lists the replacement of a consumer unit as notifiable work. It is certified by a registered competent person, a registered third-party certifier or a building control body.
What certificate do I get after a consumer unit replacement?
Electrical Safety First says you should receive an Electrical Installation Certificate and a Building Regulations compliance certificate. Approved Document P says the compliance certificate should reach the occupier within 30 days of the work being completed.
My EICR says there is no RCD protection. Must the board be replaced?
Check the code the inspector gave it on the report. Electrical Safety First gives a fuse box with no RCD protection as an example of code C3, improvement recommended. It says upgrading is recommended so the board meets the latest standard, but it is not urgent and a C3 is a recommendation only.