Garage consumer unit: power to a garage or outbuilding
A garage consumer unit is a small second board in a garage, shed or other outbuilding, fed by its own cable from the house. This guide covers when the work is notifiable, the earthing choice, RCD protection, and the certificate the job should come with. It is a job for a registered electrician.
Last updated
What a garage consumer unit is
It is a small second board, fed by one cable from the house. People often call the cable a sub-main and the board a sub board. The IET model forms for BS 7671:2018+A4:2026 call them a distribution circuit and a distribution board or consumer unit. The schedule for each board records its reference, its location, where it is supplied from and the device protecting the distribution circuit.
The IET’s Wiring Matters article “A supply to a detached outbuilding” (Autumn 2005) works through a garage that needs lighting and socket-outlets. It was written to the 16th Edition, so treat it as a guide to the layouts and design choices, not as current regulation. It describes two layouts.
| Layout | How the article describes it |
|---|---|
| Spare way and a garage board | The preferred method. A circuit-breaker goes in a spare way of the house consumer unit. A cable runs to a small two-way board in the garage, with one circuit for lighting and one for the socket-outlets |
| Spur from a house ring circuit | Possible only if the ring final circuit is suitable for the extra load. The article warns the garage could overload it |
Either way, the article says the contractor first verifies that the existing equipment, including the distributor’s, is adequate for the added load, and that the existing earthing and bonding are adequate.
Is power to a garage notifiable?
In England, usually yes. Part P of Schedule 1 to the Building Regulations 2010 covers more than the house. It applies to installations meant to run at low or extra-low voltage, including those:
- in or attached to a dwelling, which takes in an attached or integral garage
- in a building that gets its electricity from a source within or shared with a dwelling
- in a garden, or on land associated with a building, supplied the same way
Approved Document P names sheds, detached garages and domestic greenhouses as outbuildings within Part P. It adds that garages and sheds sharing their electricity with a dwelling are not exempt.
Regulation 12(6A) then lists the work that must be notified. The first item is the installation of a new circuit. A new cable from its own protective device in the house consumer unit to a garage board is a new circuit (the IET forms call it a distribution circuit), and so are the circuits from that board. Approved Document P says additions and alterations to existing circuits outside special locations are not notifiable. Our Part P guide covers the routes for notifying and the rules for Wales.
Earthing a garage or outbuilding: PME or TT
This is the main design decision, and it belongs to the electrician. The 2005 IET article assumes the house has a PME supply, shown as TN-C-S (PME) on the IET forms. It sets out two options for a garage that contains an extraneous-conductive-part such as a metal water pipe.
- Keep the garage on the house earthing. The garage is treated as part of the house installation. Main bonding connects the garage pipe back to the main earthing terminal in the house, sized for PME conditions.
- Make the garage a TT installation. A local earth electrode is provided at the garage. The metal water pipe must not be used as the electrode. An RCD protects both garage circuits. The pipe is bonded to the earthing terminal of the garage board.
With TT, the article adds two cautions. Metal parts earthed by different means must not be within reach of each other. The armour or protective conductor of the supply cable must not be connected to, or within reach of, exposed metal parts in the outbuilding.
A later IET article (Wiring Matters, May 2020) makes these points about separate “TT islands” at vehicle charging points:
- buried services can be struck when earth rods are driven
- an electrode too close to buried metalwork on the PME system gives no protection
- some distribution network operators may require a greater separation distance than the IET’s recommendations
The 2005 article uses 16th Edition regulation numbers, so the electrician works from the current BS 7671 and the network operator’s requirements. For how bonding to metal pipes is judged, see earth bonding.
RCD protection and the cable run
The 2005 article notes that a garage socket-outlet is very likely to supply portable equipment used outdoors. The IET model condition report for BS 7671:2018+A4:2026 lists RCD protection not exceeding 30 mA as an additional requirement:
- for all socket-outlets rated up to 32 A, unless an exception is permitted
- for mobile equipment rated up to 32 A for use outdoors
- for cables concealed in walls at a depth of less than 50 mm
- for cables concealed in walls or partitions containing metal parts, at any depth
- for final circuits supplying luminaires in domestic (household) premises
The article lists several places for the RCD, including the house consumer unit, the main switch of the garage board, or an RCBO on the socket-outlet circuit. RCBO vs RCD compares the devices.
The cable between the buildings must be suitably protected, the article says, either run overhead or buried in the ground. Where rodents are likely, as in a garage, the wiring must resist gnawing.
Does a garage board need a metal enclosure?
Regulation 421.1.201 of BS 7671 requires a non-combustible enclosure on consumer units in domestic premises. An IET paper from 2015 says the rule was mainly meant for the inside of a household building and any garage or outbuilding that is integral, attached or in close proximity. Where there is doubt about a detached building, it suggests judging how likely a fire starting in the board is to spread to the house. The paper says the regulation is not intended for a unit mounted outdoors on the outside of a building. Consumer unit replacement explains the regulation.
EV charging in a garage
A charge point changes the earthing question. Regulation 722.411.4.1 of BS 7671 sets conditions for using a PME earth at a charging point. The IET’s May 2020 article says installers increasingly chose TT earthing to meet it, and that this did not always improve safety. It describes open PEN detection devices as one alternative, with guidance in the IET Code of Practice for Electric Vehicle Charging Equipment Installation. The installer chooses the method to the current edition.
Which certificate the job gets
The notes to the IET model forms say an Electrical Installation Certificate is used for a new installation, and for an addition or alteration where one or more new circuits have been introduced. A new garage supply falls in the second group. The certificate comes with a schedule of inspections, and schedules of circuit details and test results for each board. The original goes to the person who ordered the work. Where the work is notifiable, the occupier should also get a Building Regulations compliance certificate. See our guide to the Electrical Installation Certificate.
The Minor Electrical Installation Works Certificate is headed for work that does not include a new circuit. That fits a later job, such as an extra socket-outlet on an existing garage circuit.
This is an electrician’s job. A garage supply involves design, earthing decisions and testing with instruments. Ask a registered electrician, and keep the certificates with the house papers.
For electricians: the EICR and the small jobs after
ClearWorks is a certificate app for electricians. Fill in the EICR on your phone, one circuit at a time, to BS 7671:2018+A4:2026. Zs is checked against the protective device, and readings outside limits are flagged. Later jobs on an existing garage circuit, such as an added socket-outlet, are minor works: issue the minor works certificate on site and send it before you leave. It works with no signal.
The electrical plan is £15 per engineer a month + VAT. Pay as you go is £2.50 a certificate + VAT. Your first 3 certificates are free. See pricing.
EICR software for electricians
This page is a summary for general information, last checked 18 November 2026. It is not the standard, design advice or an instruction for carrying out work. Electricians must follow the current edition of BS 7671, the Building Regulations, the network operator’s requirements and manufacturer instructions, and remain responsible for the design, the work, the testing and the certificates. The IET articles cited date from 2005, 2015 and 2020 and quote earlier editions of BS 7671, so check the current wording. Householders should not install or alter a garage supply themselves. The notification rules described are those for England. ClearWorks is independent and is not affiliated with or endorsed by the IET, BSI, NICEIC or NAPIT.
Sources: IET Wiring Matters: A supply to a detached outbuilding (Autumn 2005) and The IET Code of Practice for Electric Vehicle Charging Equipment Installation, 4th Edition (May 2020); IET: New non-combustible enclosure requirement for consumer units (2015) and BS 7671:2018+A4:2026 model forms; legislation.gov.uk: Building Regulations 2010, regulation 12 and Schedule 1, Part P; GOV.UK: Approved Document P, 2013 edition. Last checked 18 November 2026.
Garage consumer unit questions
Do I need a consumer unit in my garage?
Not always. IET Wiring Matters (Autumn 2005) describes two layouts for a detached garage. Its preferred method is a circuit from a spare way in the house consumer unit to a small board in the garage, with separate lighting and socket-outlet circuits. A spur from a house ring circuit is possible only if that circuit suits the extra load.
Is running power to a garage notifiable under Part P?
In England, usually yes. Part P applies to a garage attached to a dwelling and to a building that gets its electricity from a dwelling. Regulation 12(6A) of the Building Regulations 2010 makes the installation of a new circuit notifiable, and a new supply from its own protective device in the house consumer unit to a garage board is a new circuit.
Does a detached garage need its own earth rod?
It depends on the design. The IET article sets out two options where the house has a PME supply and the garage has a metal water pipe: keep the garage on the house earthing with main bonding, or make it a TT installation with a local earth electrode and RCD protection. The electrician decides to the current BS 7671.
Do garage sockets need RCD protection?
The IET model forms for BS 7671:2018+A4:2026 list RCD protection not exceeding 30 mA for all socket-outlets rated up to 32 A, unless an exception is permitted, and for mobile equipment rated up to 32 A for use outdoors. The IET notes a garage socket-outlet is very likely to supply portable equipment outdoors.
Does a garage consumer unit have to be metal?
Regulation 421.1.201 of BS 7671 requires a non-combustible enclosure in domestic premises. An IET paper from 2015 says it was mainly meant for the household building and any garage or outbuilding that is integral, attached or in close proximity. For other detached buildings it suggests judging the risk of fire spreading to the house.
What certificate do I get for a new garage supply?
An Electrical Installation Certificate. The notes to the IET model forms say it is used for an addition or alteration where one or more new circuits have been introduced. It comes with schedules of inspections, circuit details and test results, and the original goes to the person who ordered the work.
Can I wire my garage myself?
Leave it to a registered electrician. A garage supply involves design, earthing decisions and testing with instruments, and in England a new circuit is notifiable building work.